We have prepared erosion and sediment control plans for small development sites and complete mining operations for both the construction and operational phases.
This includes specification and concept design of best practice measures in accordance with industry guidelines, as well as custom-designed systems that are practical and achieve compliance with environmental objectives at minimum cost. Best practice measures include effective drainage design and erosion control measures as source controls to minimise downstream sediment controls.
Case studies

Peabody Energy Australia
Development of an Erosion and Sediment Control Strategy
Developed guidelines for Peabody’s coal operations in NSW and Qld
Other projects
Middlemount Coal Mine
MIddlemount, Queensland
- Roper Creek Flood Study
- Environmental Compliance
- Water Balance.
Integra Coal Mine Western Extension
Singleton, New South Wales
- Assessment of spoil seepage rates
- Assessment of operational water management
- Water balance modelling
- Surface water technical report for Environmental Assessment
- Water management plan
- Erosion and sediment control plan.