Northern Territory
Tennant Creek Stormwater Investigation
Drainage characteristics in Tennant Creek are complex, particularly during large flow events
The key challenge was to develop an understanding of the drainage behaviour and limitations of the Tennant Creek network
Kilgariff Flood and Stormwater Management Plan
The site is affected by regional flooding from the Todd River
The key challenge was to define a drainage strategy that was sympathetic to the local environment
Katherine Flood and Flood Mitigation Studies
The key challenge for this project was to identify cost-effective flood risk management measures
The flood modelling showed that it is possible to significantly reduce flooding of properties in Katherine during smaller more frequent floods
Kalkarindji and Daguragu Floodplain Mapping Study
Kalkarindji is a growing major remote township
The NT Government wanted to identify flood-free land within the Kalkarindji township and environs
Jervois Base Metal Project EIS, Surface Water Assessment
KGL Resources is planning to mine copper and other base metals such as lead and zinc
Surface water management is a balance of ensuring adequate water supply and managing contaminated runoff
Borroloola Floodplain Mapping Study
Borroloola has a long history of flooding from the McArthur River
The study results assisted the NT Government to develop safer and more resilient communities
Adelaide River Town Flood Study
A comprehensive flood study and impact assessment of the Mackenzie River
The flood model results were used to identify the existing flood risk and flood hazards throughout the Adelaide River town