Rhys Cullen

Tennant Creek Stormwater Investigation

Drainage characteristics in Tennant Creek are complex, particularly during large flow events

The key challenge was to develop an understanding of the drainage behaviour and limitations of the Tennant Creek network

Kilgariff Flood and Stormwater Management Plan

The site is affected by regional flooding from the Todd River

The key challenge was to define a drainage strategy that was sympathetic to the local environment

Jervois Base Metal Project EIS, Surface Water Assessment

KGL Resources is planning to mine copper and other base metals such as lead and zinc

Surface water management is a balance of ensuring adequate water supply and managing contaminated runoff

Springfield Development

Flood and stormwater management for one of Australia’s largest urban developments

The adopted strategy maximised the developable area of the site

Redbank Motorway Estate

Stormwater management plan for the proposed Redbank Motorway Estate

MIKE11 and TUFLOW modelling of the Brisbane River

Alice Springs Farms Area Flood Mapping Study

Two dimensional flood modelling of the Todd River downstream of Alice Springs to determine design flood levels including the impact of sediment transport. Flood mapping for land use planning and emergency management. Department of Planning and Infrastructure

Tallow Creek Flood Study

Two-dimensional flood modelling of Tallow Creek and its floodplain to assess the impact of various developments on flooding. Byron Shire Council and various developers